Wednesday, September 14, 2011

South Wall Insulation & Stonework Begins


Work begins this week to apply insulation on the south wall of the Main Library.  As noted earlier, the original 1962 design of the library did not incorporate insulation in any of the exterior walls.  Once the insulation is applied to this side of the library the original stone that was removed last month will be re-applied.

The other walls will be insulated from the inside as part of the renovation phase of the project.  The inside of the south wall is adorned with the large Bechtel Mural.  In order to retain the original mural, the south wall insulation work needed to be done from the outside.

Click here to view recent construction photos.